subaru Workshop Repair Guides

Subaru Workshop Service and Repair Manuals

Brake Master Cylinder > < Brakes - ABS ECU Applications/Service|Page 3234
Page 3
background image

1. Install relay box and connector bracket. 

Tightening torque: 13 Nm (1.3 kgf-cm, 9.4 ft. lbs.)

2. Secure relay box connector to connector bracket

CAUTION: Align connector with mating receptacle.

3. Connect connector to relay box.
4. Install air intake duct. 
5. Connect ground cable to battery.

Brake Master Cylinder > < Brakes - ABS ECU Applications/Service|Page 3234