subaru Workshop Repair Guides

Subaru Workshop Service and Repair Manuals

Transmission Speed Sensor, M/T > < Gear Sensor/Switch, M/T|Testing and Inspection|Page 3502
Page 2
background image

BACK-UP LIGHT SWITCH AND NEUTRAL POSITION SWITCH 

1. Install the back-up light switch and neutral position switch with harness.

Tightening torque: 24.5 Nm (2.5 kgf-m, 18.1 ft. lbs.) 

2. Connect the connector of back-up light switch and neutral position switch.
3. Install the air intake duct and cleaner case.
4. Connect the battery ground cable to battery.

Transmission Speed Sensor, M/T > < Gear Sensor/Switch, M/T|Testing and Inspection|Page 3502