Forester F4-2.5L SOHC (2004)
13. Install the oil charger pipe with O-ring.
14. Insert the input shaft while turning lightly by hand. At this time, not to damage the bushing.
Normal protrusion A: 50 - 55 mm (1.97 - 2.17 inch)
15. Install the torque converter clutch assembly.
16. Install the transmission assembly to the vehicle.
INSPECTION
Measure the backlash and adjust to within specifications.