Forester F4-2.5L Turbo (2009)
3) Connect the terminal to the oil pressure switch.
4) Install the generator to the bracket.
5) Connect the ground cable to the battery.
6) Install the collector cover.
INSPECTION
Check the oil pressure switch installation portion for oil leakage and oil seepage.