Forester F4-2.5L Turbo (2009)
2. PURGE CONTROL SOLENOID VALVE 2
Install in the reverse order of removal.
NOTE: Connect the evaporation hose as shown in the figure.
2. PURGE CONTROL SOLENOID VALVE 2
Install in the reverse order of removal.
NOTE: Connect the evaporation hose as shown in the figure.