Forester F4-2.5L Turbo (2009)
6) Using new self-locking nuts, connect the stay to the transmission bracket.
Tightening torque: 18 N-m (1.8 kgf-m, 13.3 ft-lb)
7) Install the heat shield cover.
8) Install the rear exhaust pipe and muffler.
9) Install the plate assembly to the vehicle body.
Tightening torque: 18 N-m (1.8 kgf-m, 13.3 ft-lb)
1) Set the plate assembly to the vehicle.
2) Temporarily tighten the bolt (A).
3) Tighten the bolt (B).
4) Tighten the bolt (A).
5) Tighten the bolts (C) and (D).