subaru Workshop Repair Guides

Subaru Workshop Service and Repair Manuals

Procedures|Page 2967 > < Procedures|Page 2965
Page 2
background image

8) Remove the transmission cushion rubber.

Installation

INSTALLATION 

PITCHING STOPPER

 

1) Install the pitching stopper.

Tightening torque:

T1: 50 N-m (5.1 kgf-m, 36.9 ft-lb)
T2: 58 N-m (5.9 kgf-m, 42.8 ft-lb)

2) Install the air intake chamber and intake boot.
3) Connect the battery ground cable to the battery.

CROSS MEMBER AND CUSHION RUBBER

 

1) Install the transmission cushion rubber to the transmission, and tighten the bolt (A). 
2) Install the transmission cushion rubber to the center crossmember, and tighten the nut (B).

 

Tightening torque: 

Bolt (A): 35 N-m (3.6 kgf-m, 25.8 ft-lb)
NUT (B): 35 N-m (3.6 kgf-m, 25.8 ft-lb)

3) Install the front crossmember and rear crossmember.

Tightening torque:

Procedures|Page 2967 > < Procedures|Page 2965