Impreza GT F4-2.5L Turbo (2009)
Main Relay (Computer/Fuel System): Testing and Inspection
Main Relay
INSPECTION
1. Measure the resistance between main relay terminals.
2. Connect terminal No. 3 to the battery positive terminal and the No. 4 terminal to the battery ground terminal, and measure the resistance between
the main relay terminals.