subaru Workshop Repair Guides

Subaru Workshop Service and Repair Manuals

Evaporative Shut Valve > < Evaporative Emission Control Canister|Description and Operation
Page 1
background image

Evaporative Emission Control Canister: Service and Repair

1. Lift-up the vehicle.
2. Disconnect evaporation hoses from canister.

3. Remove canister from body.

4. Installation is in the reverse order of removal.

Tightening torque:
22.5 ± 7 Nm (2.3 ± 0.7 kg.m, 16.6 ± 5.1 ft.lb)

Evaporative Shut Valve > < Evaporative Emission Control Canister|Description and Operation