subaru Workshop Repair Guides

Subaru Workshop Service and Repair Manuals

Intake Manifold|Removal and Installation|Page 1359 > < Intake Manifold|Removal and Installation|Page 1357
Page 8
background image

5) Assemble throttle body to intake manifold.

Tightening torque:  22 ± 2 N.m (2.2 ± 0.2 kg-m, 15.9 ± 1.4 ft. lb) 

CAUTION:  Replace gasket with a new one. 

6) Install idle air control solenoid valve to intake manifold.

Tightening torque:  6.4 ± 0.5 N.m (0.65 ± 0.05 kg-m, 4.7 ± 0.4 ft. lb) 

CAUTION:  Replace gasket with a new one. 

7) Install engine harness onto intake manifold.

8) Connect connectors to throttle position sensor, ignition coil, fuel injectors, idle air control solenoid valve, purge control solenoid valve and

EGR solenoid valve.
A) EGR solenoid valve
B) Throttle position sensor
C) Idle air control solenoid valve
D) Purge control solenoid valve
E) Harness band

9) Install EGR valve.

Tightening torque:  19 ± 1.5 N.m (1.9 ± 0.15 kg-m, 13.7 ± 1.1 ft. lb) 

CAUTION:  Replace gasket with a new one. 

10) Install BIT with BIT holder bracket.
11) Connect BIT hoses from EGR solenoid valve and intake manifold.
12) Connect back pressure hose from pipe.

Intake Manifold|Removal and Installation|Page 1359 > < Intake Manifold|Removal and Installation|Page 1357