subaru Workshop Repair Guides

Subaru Workshop Service and Repair Manuals

Intake Manifold|Removal and Installation|Page 1651 > < Intake Manifold|Removal and Installation|Page 1649
Page 7
background image

9. Install the PCV pipe (A), harness assembly (B) and intake duct (C) to intake manifold.

10. Tighten the bolt which secures air bypass pipe onto intake manifold.

11. Install the connectors to fuel injector (A), tumble generator valve position sensor (B) and tumble generator valve actuator (C).

12. Install the throttle body to intake manifold.

NOTE:  Use new O-rings.

Intake Manifold|Removal and Installation|Page 1651 > < Intake Manifold|Removal and Installation|Page 1649