Outback F6-3.0L DOHC (2006)
5. Temporarily connect the pressure hose and pipe C, the return hose and D. Place the clamp E in the position shown in the figure, and tighten the
bolt temporarily.
6. Tighten the clamp E.
Tightening torque: 7.4 Nm (0.75 kgf-cm, 5.4 ft. lbs.)
7. Tighten the pressure hose and pipe C, the return hose and pipe D.
Tightening torque: 15 Nm (1.5 kgf-cm, 10.8 ft. lbs.)
8. Connect the pipe A and B to the four pipe joints of gearbox.
Tightening torque: Refer to COMPONENT in General Description.
9. Install the front crossmember support plate and jack-up plate.
10. Lower the vehicle.