Tribeca F6-3.6L (2008)
Power Window Switch: Testing and Inspection
POWER WINDOW CONTROL SWITCH
INSPECTION
1. MAIN SWITCH
Measure the switch resistance.
NOTE:
-
Make sure the battery voltage is applied to the terminal No. 13(+) and 5(-) when measuring resistance, because the main switch is controlled
by microcomputer.
-
Make sure that the window lock switch is measured in the UNLOCK position.
2. SUB-SWITCH
Measure the switch resistance.