suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Fuel Delivery and Air Induction > < Positive Crankcase Ventilation Valve|Testing and Inspection
Page 1
background image

Positive Crankcase Ventilation Valve: Service and Repair

PCV Valve Removal and Installation

Removal

1. Remove engine cover.
2. Disconnect PCV hose from PCV valve.
3. Remove PCV valve from cylinder head cover.

Installation

Reference: PCV Valve Inspection

1. Apply sealant to thread part of PCV valve (1).

"A": Water tight sealant 99000–31250SUZUKI Bond No.1207F ()

2. Install PCV valve (1) to cylinder head cover.

Tightening torque
PCV valve a: 27 N.m (2.7 kg-m, 19.5 lb-ft)

3. Connect PCV hose (2) to PCV valve (1).
4. Install engine cover.

Fuel Delivery and Air Induction > < Positive Crankcase Ventilation Valve|Testing and Inspection