Equator 2WD V6-4.0L (2009)
Standard: -0.14 to 0.14 mm (-0.0055 to 0.0055 in)
^
Measure two positions (both intake and exhaust side) for a single bank.
^
If the measured value is out of the standard, re-install camshaft bracket (No. 1).
7) Check and adjust the valve clearance.
8) Installation of the remaining components is in the reverse order of removal.
INSPECTION AFTER INSTALLATION
Inspection of Camshaft Sprocket (INT) Oil Groove
CAUTION:
^
Perform this inspection only when DTC P0011 or P0021 are detected in "DTC check" of SDT and it is directed according to inspection
procedure.
^
Check when engine is cold so as to prevent burns from any splashing engine oil.
1) Check the engine oil level.
2) Perform the following procedure so as to prevent the engine from being unintentionally started while checking.
a) Release fuel pressure.
b) Disconnect ignition coil and injector harness connectors.
3) Remove intake valve timing control solenoid valve.
4) Crank the engine, and then make sure that engine oil comes out from camshaft bracket (No. 1) oil hole. End cranking after checking.