suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Timing Chain: Exploded View|Page 1151 > < Timing Chain: Exploded View|Page 1149
Page 1
background image

Timing Chain: Service and Repair
Timing Chain: Removal and Installation

Timing Chain: Removal and Installation

NOTE:
^

This information describes procedures for removing/installing front timing chain case and timing chain related parts, and rear timing chain case,
when oil pan (upper) needs to be removed/installed for engine overhaul, etc.

REMOVAL

1) Remove engine room cover using power tool. 
2) Release the fuel pressure. 
3) Drain engine oil. 

CAUTION:
^

Perform this step when engine is cold.

^

Do not spill engine oil on drive belts.

4) Drain engine coolant from radiator. 

CAUTION:
^

Perform this step when engine is cold.

^

Do not spill engine coolant on drive belts.

5) Remove radiator cooling fan assembly. 
6) Separate engine harnesses removing their brackets from front timing chain case.
7) Remove drive belts. 
8) Remove power steering oil pump from bracket with piping connected, and temporarily secure it aside. 
9) Remove power steering oil pump bracket. 

10) Remove generator. 
11) Remove water bypass hose, water hose clamp and idler pulley bracket from front timing chain case.
12) Remove right and left intake valve timing control covers.

^

Loosen bolts in reverse order as shown.

Timing Chain: Exploded View|Page 1151 > < Timing Chain: Exploded View|Page 1149