suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Valve Clearance|Specifications|Page 617 > < Valve Clearance|Specifications
Page 1
background image

Valve Clearance: Service and Repair

Camshaft Valve Clearance

INSPECTION

NOTE:
Perform the following inspection after removal, installation or replacement of camshaft or valve-related parts, or if there are unusual engine conditions
due to changes in valve clearance over time (starting, idling, and/or noise).

1) Remove the engine room cover. 
2) Remove the air cleaner and air duct assembly. 
3) Remove rocker covers (RH and LH banks). 
4) Measure the valve clearance as follows:

a) Set No. 1 cylinder at TDC of its compression stroke. 

^

Rotate crankshaft pulley clockwise to align timing mark (A) (grooved line without color) with timing indicator (B).

^

Make sure that intake and exhaust cam noses on No. 1 cylinder (engine front side of RH bank) are located as shown.

Valve Clearance|Specifications|Page 617 > < Valve Clearance|Specifications