suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Removal and Replacement|Page 3909 > < Removal and Replacement|Page 3907
Page 3
background image

CAUTION:
When installing the components with rubber bushings, the final tightening of the nuts and bolts must be done with the vehicle in an unladen
condition (the fuel, engine coolant, and engine oil full; the spare tire, jack, hand tools and mats in their designated positions) with the tires on
the ground.

REMOVAL

1) Support the rear final drive assembly with a suitable jack to relieve the tension from the rear leaf spring. 

^

The axle weight should be supported, but there should be no compression in the rear leaf spring.

2) Remove the shock absorber lower nut and bolt using power tool.

3) Remove the four rear spring clip U-bolt nuts using power tool, then remove the rear spring pad.

Removal and Replacement|Page 3909 > < Removal and Replacement|Page 3907