Equator 2WD V6-4.0L (2009)
8) Tighten the rear spring shackle nuts, rear leaf spring front nut, and shock absorber nuts to specification.
^
When installing the components with rubber bushings, the final nut tightening must be carried out under unladen* conditions with the tires on
level ground.
*(Fuel, radiator coolant and engine oil full. Spare tire, jack, hand tools and mats in designated positions.)