suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Component Inspection|Page 244 > < Component Inspection
Page 1
background image

Engine Temperature Sensor: Testing and Inspection
Signal Inspection (With A/T Only)

Check that specified duty (voltage) is observed between Gr/B wire terminal of TCM and ground as engine coolant temperature changes. If check
result is not satisfactory, check each wire harness, circuit, ECT sensor and cruise controller (if equipped).

Component Inspection|Page 244 > < Component Inspection