suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Shift Solenoid, A/T|Specifications|Page 2323 > < Shift Solenoid, A/T|Specifications|Page 2321
Page 2
background image

-

Shift solenoid No.1 and No.2 and TCC solenoid Check resistance between terminal and solenoid body.
Standard resistance: 11 - 15 ohm

-

Throttle pressure control solenoid Check resistance between each terminals.
Standard resistance: 3.3 - 3.7 ohm

Operation Check (Shift solenoid valves No.1 and No.2.) 

1. Apply oiler to solenoid valve and give compression by hands and then check to be sure that transmission fluid from oiler does not come out of

holes in solenoid valve when battery voltage is not conducted.

2. Under the same conditions as above, conduct battery voltage and then make sure that fluid comes out with vigor. If check result is not as

described, replace shift solenoid valve.

TCC Solenoid Valve 

1. Apply oiler to solenoid valve and give compression by hands and then check to be sure that transmission fluid -from oiler does not come out of

holes in solenoid valve when battery voltage is conducted.

2. Under the same conditions as above, release battery voltage and then make sure that fluid comes out with vigor. if check result is not as

described, replace shift solenoid valve.

INSTALLATION 

Shift Solenoid, A/T|Specifications|Page 2323 > < Shift Solenoid, A/T|Specifications|Page 2321