suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Intake Manifold|Specifications|Page 984 > < Intake Manifold|Specifications|Page 982
Page 4
background image

1. Install new intake manifold gasket to cylinder head.
2. Install intake manifold.

Tighten bolts and nuts to specified torque.
Tightening Torque (a): 23 Nm (2.3 kg-m, 17.0 ft. lbs.)

3. Connect coolant pipe to intake manifold.

4. Install EGR pipe.

5. Install intake manifold front stiffener and rear stiffener.

Tighten bolts to specified torque.
Tightening Torque

(a): 25 Nm (2.5 kg-m, 18.0 ft. lbs.)
(b): 50 Nm (5.0 kg-m, 36.5 ft. lbs.)

6. Install throttle body to intake manifold with new gasket.

Tighten bolts and nuts to specified torque.

Intake Manifold|Specifications|Page 984 > < Intake Manifold|Specifications|Page 982