suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Lamps and Indicators - Engine > < Intake Manifold|Specifications|Page 983
Page 5
background image

7. Connect the following hoses:

^

Brake booster hose to intake manifold

^

PCV hose to PCV valve

^

Fuel pressure regulator vacuum hose to intake manifold

^

Coolant hoses to throttle body and cylinder head

^

Breather hose to throttle body

^

Vacuum hose to EVAP canister purge valve

8. Connect the following electric lead wires:

^

IAC valve

^

TP sensor

^

MAF sensor

^

EGR valve

^

EVAP valve canister purge valve

^

MDP sensor

^

Grand terminal from throttle body

9. Install accelerator cable to bracket.

10. Connect accelerator cable to throttle body.

Adjust accelerator cable play.

11. Install air cleaner outlet hose. 
12. Connect IAT sensor wire at coupler.
13. Check to ensure that all removed parts are back in place.

Reinstall any necessary parts which have not been reinstalled.

14. Refill cooling system.
15. Connect negative cable at battery.
16. Finally, start engine and check for engine coolant leaks.

Lamps and Indicators - Engine > < Intake Manifold|Specifications|Page 983