suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Exhaust Manifold|Diagrams|Page 1006 > < Exhaust Manifold|Diagrams|Page 1004
Page 3
background image

^

Always install new bolts with pre-coated adhesive to the locations with * mark,

^

Tighten manifold nuts to specified torque.

3. Attach exhaust manifold stiffener to transmission.

4. Install exhaust No.1 pipe (1) and stiffener (3). Tighten exhaust No.1 pipe bolts and nuts to specified torque.

5. Reverse removal procedure to install front propeller shaft, if removed. When installing propeller shaft, align match mark (1). Use the following

specification to torque universal joint flange.

6. Connect EGR pipe to left (No. 1) bank exhaust manifold (1).
7. Install exhaust manifold covers (2). 

8. Install oil level gauge guide (3) using new O-ring.

Exhaust Manifold|Diagrams|Page 1006 > < Exhaust Manifold|Diagrams|Page 1004