Grand Vitara 2WD V6-3.2L (2010)
Installation
1) Lubricate new grommets with the same fluid as the one to fill reservoir (1) with. Then press-fit grommets (3) to master cylinder (2). Grommets (3)
must be seated in place.
Installation
1) Lubricate new grommets with the same fluid as the one to fill reservoir (1) with. Then press-fit grommets (3) to master cylinder (2). Grommets (3)
must be seated in place.