suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Advanced Air Bag|Page 5903 > < Advanced Air Bag|Page 5901
Page 15
background image

(D): 09932-76510

6. Short two deployment harness leads together by fully seating one banana plug (1) into the other.

WARNING:  Deployment harness (A) shall remain shorted and not be connected to 12 volts vehicle battery until you are ready to deploy 
air bag (inflator) module or activate seat belt pretensioner.

7. Connect adapter cable (B), (C) or (D) in series with deployment harness (A) to air bag (inflator) module or seat belt pretensioner as follows.

-

For driver air bag (inflator) module [A] Connect adapter cable in series with deployment harness (A) and push adapter cable (C) connector to
driver air bag (inflator) module connector till click can be heard.

-

For passenger air bag (inflator) module [B] Connect adapter cable (C) in series with deployment harness (A) and push adapter cable (C)
connector to passenger air bag (inflator) module connector till click can be heard.

-

For side-air bag (inflator) module [C] Connect adapter cable (B) in series with deployment harness (A) and push adapter cable (C) connector
to side bag (inflator) module connector till click can be heard.

-

For side curtain-air bag (inflator) module [D] Connect adapter cable (D) in series with deployment harness (A) to curtain bag (inflator) module
and lock connector with lock part.

-

For seat belt pretensioners [E] Connect adapter cable (D) in series with deployment harness (A) to seat belt pretensioner and lock connector
with lock part.

Advanced Air Bag|Page 5903 > < Advanced Air Bag|Page 5901