suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Removal and Replacement|Page 4614 > < Starter Motor|Diagrams
Page 1
background image

Starter Motor: Removal and Replacement

Starting Motor Removal and Installation

J24B

Removal

1. Disconnect negative (-) cable from battery.
2. Remove intake manifold.
3. Disconnect magnetic switch lead wire (1) and starting motor cable (2) from starting motor.
4. Remove starting motor mounting bolts (3).
5. Remove starting motor (4).

Installation

Reverse removal procedure noting the following.

-

Tighten starting motor mounting bolts (3) and starting motor cable nut (5) to specified torques.

Tightening torque
Starting motor cable nut (a): 11 N.m (1.1 kg-m, 8.5 lbf-ft)
Starting motor mounting bolt (b): 45 N.m (4.6 kg-m, 33.5 lbf-ft)

Removal and Replacement|Page 4614 > < Starter Motor|Diagrams