suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Intake Manifold|Specifications|Page 1005 > < Intake Manifold|Specifications|Page 1003
Page 5
background image

3. Install throttle body (2) to intake collector (1) with new throttle body gasket. Tighten bolts and nuts to specified torque.

4. Install IAC valve (1), EGR valve (2), EVAP canister purge valve (3), manifold absolute pressure sensor, clamps and each hoses to intake collector

and throttle body if removed. Use new gasket, when installing IAC valve and EGR valve.

5. Install throttle body and intake collector assembly to intake manifold with new intake collector gaskets. 

6. Connect heater hose (1), EVAP canister hose (4), tank pressure control solenoid valve hose, fuel feed hose (2) and fuel return hose (3).
7. Install EGR pipe (3) with new gaskets. 
8. Connect EVAP canister purge valve hose (4) and heater hose (5). 
9. Connect PCV hose (6), breather hose (8) and water hose (7).

10. Connect couplers of manifold absolute pressure sensor, EVAP canister purge valve (1) and EGR valve (2). Fix wire harness with clamps.
11. Install clamp bracket (5) to intake collector.
12. Connect earth terminal (4) to intake collector.

Intake Manifold|Specifications|Page 1005 > < Intake Manifold|Specifications|Page 1003