suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Removal and Replacement|Page 3422 > < Removal and Replacement|Page 3420
Page 5
background image

Assembly

Reference: Generator Inspection
Reference: Generator Components

1. Install rectifier (4) to rear housing and then tighten screw (3).
2. Install regulator assembly (2) to rear housing and then tighten screw (1).

3. Install insulator (2) and then tighten "B" terminal nut to specified torque.

Tightening torque
"B" terminal nut : 9 N.m (0.9 kg.m, 7.0 lbf.ft)

Removal and Replacement|Page 3422 > < Removal and Replacement|Page 3420