Grand Vitara 4WD V6-3.2L (2010)
Solar Sensor: Testing and Inspection
Sunload Sensor Inspection
1. Remove sunload sensor.
2. Light over the sensor vertically with an incandescent light of approximately 100 watt.
3. The distance between the sensor and the light should be approximately 100 mm (3.94 in.).
4. Measure the voltage between the terminals with the (+) probe on the terminal "a" and the (-) probe on the terminal "b".
5. Make sure if the voltage is approximately 0.38 - 0.42 V. If not, replace the sensor with the new one.
Sunload sensor specifications
"a" - "b" : Approx. 0.38 - 0.42 V