suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Air Conditioning Switch|Testing and Inspection|Page 3254 > < Wheel Fastener|Specifications|Page 3249
Page 1
background image

Air Conditioning Switch: Testing and Inspection

A/C Switch

-

Press A/C switch button (2) and check if there is continuity between terminals "D" and "G".

-

With battery voltage (+) connected to terminal "K" and (-) to terminal "D", press A/C switch button (2) and check if indicator lamp (3) lights.

Air Conditioning Switch|Testing and Inspection|Page 3254 > < Wheel Fastener|Specifications|Page 3249