suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Throttle Body|Locations|Page 1905 > < Throttle Body|Locations|Page 1903
Page 4
background image

24. Remove intake manifold bolts (8 pc.) and nuts (4 pc.).
25. Remove intake manifold.

INSTALLATION

1. Install new intake manifold gaskets to cylinder heads.

2. Install intake manifold.

Tighten bolts and nuts to specified torque.
Tightening Torque (a): 23.0 Nm (2.3 kg-m, 16.5 ft. lbs.)

3. Install throttle body to intake collector with new throttle body gasket.

Tighten bolts and nuts to specified torque.
Tightening Torque (b): 12.0 Nm (1.2 kg-m, 8.5 ft. lbs.)

Throttle Body|Locations|Page 1905 > < Throttle Body|Locations|Page 1903