suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Throttle Cable/Linkage > < Throttle Body|Locations|Page 1906
Page 7
background image

22. Install strut tower bar.
23. Check to ensure that all removed parts are back in place.

Reinstall any necessary parts which have not been reinstalled.

24. Refill cooling system, referring to Section 6B.
25. Connect negative cable at battery.
26. Upon completion of installation, verify that there is no fuel leak age at each connection according to procedure described in Powertrain

Management.

Throttle Cable/Linkage > < Throttle Body|Locations|Page 1906