suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Blower Motor Relay|Testing and Inspection|Page 68 > < Cruise Control Module|Testing and Inspection|Page 63
Page 1
background image

Blower Motor Relay: Testing and Inspection

HEATER BLOWER RELAY INSPECTION

1. Connect battery positive (+) terminal to terminal "2" of relay.
2. Connect battery negative (-) terminal to terminal "1" of relay.
3. Check continuity between terminal "3" and "4".

If there is no continuity when relay is connected to the battery, replace relay.

Blower Motor Relay|Testing and Inspection|Page 68 > < Cruise Control Module|Testing and Inspection|Page 63