suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Intake Manifold|Specifications|Page 1075 > < Intake Manifold|Specifications|Page 1073
Page 5
background image

2. Install intake manifold (1). Tighten bolts and nuts to specified torque.

Tightening torque

Intake manifold bolt and nut (a): 23 Nm (2.3 kg-m, 16.5 ft. lbs.) 

3. Install throttle body (2) to intake collector (1) with new throttle body gasket. Tighten bolts and nuts to specified torque.

Tightening torque

Throttle body bolt and nut (b): 23 Nm (2.3 kg-m, 16.5 ft. lbs.) 

4. Install IAC valve (1), EGR valve (2), EVAP canister purge valve (3), manifold absolute pressure (MAP) sensor, clamps and each hoses to intake

collector and throttle body if removed. 
Use new gasket, when installing IAC valve and EGR valve.

5. Install throttle body and intake collector assembly to intake manifold with new intake collector gaskets.

Intake Manifold|Specifications|Page 1075 > < Intake Manifold|Specifications|Page 1073