suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Intake Manifold|Specifications|Page 1076 > < Intake Manifold|Specifications|Page 1074
Page 6
background image

6. Connect hoses of heater, EVAP canister, tank pressure control solenoid valve, fuel feed and fuel return.

7. Install EGR pipe with new gaskets. 
8. Connect hoses of EVAP canister purge valve and heater. 
9. Connect hoses of PCV, breather and water.

10. Connect couplers of manifold absolute pressure (MAP) sensor, EVAP canister purge valve and EGR valve. Fix wire harness with clamps.

11. Install clamp bracket (5) to intake collector. 
12. Connect earth terminal (4) to intake collector. 
13. Connect couplers of TP sensor, MAP sensor and IAC valve.

Intake Manifold|Specifications|Page 1076 > < Intake Manifold|Specifications|Page 1074