suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

1st Timing Chain and Chain Tensioner|Page 1147 > < 1st Timing Chain and Chain Tensioner|Page 1145
Page 6
background image

6. Install sprockets to intake and exhaust camshafts by aligning silver plate of LH bank 2nd timing chain, match marks on intake sprocket and exhaust

sprocket respectively.

CAUTION:  Do not turn camshaft more than necessary. If turned excessively, valve and piston may get damaged.

7. Install LH bank intake and exhaust camshaft timing sprockets. 

To install it, fit a spanner to hexagonal part at the center of camshaft to hold stationary.
Tightening torque

Camshaft timing sprocket bolt (b): 80 Nm (8.0 kg-m, 57.5 ft. lbs.) 

8. With latch of tensioner adjuster No. 3 returned and plunger pushed back into body, insert stopper (pin) into set hole. After inserting it, check to

make sure that plunger will not come out.

1st Timing Chain and Chain Tensioner|Page 1147 > < 1st Timing Chain and Chain Tensioner|Page 1145