Grand Vitara LTD 2WD V6-2.5L (2001)
1. For reinstallation of timing chain, align 12 timing marks as shown in the figure by turning crankshaft.
2. Remove LH bank 2nd timing chain.
3. Remove 1st timing chain.
4. Remove timing chain guide No. 3.
5. Loosen camshaft housing bolts in such order ("1" -"17") as shown in the figure and remove them.
6. Remove camshaft housings.
7. Remove RH bank intake camshaft, RH bank exhaust camshaft, and RH bank 2nd timing chain as a set.
8. Remove timing chain tensioner adjuster No. 2.
INSPECTION
Timing Chain Guide No. 3
Check shoe for wear or damage.
RH Bank 2nd Timing Chain Sprockets