suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Exhaust Pipe > < Exhaust Manifold|Specifications|Page 1354
Page 4
background image

4. Install exhaust No. 1 (1) pipe and stiffener (3). Tighten exhaust No. 1 pipe bolts and nuts to specified torque.

Tightening torque

Exhaust No. 1 pipe and nut (b): 50 Nm (5.0 kg-m, 36.5 ft. lbs.) 

5. Reverse removal procedure to install front propeller shaft if removed. When installing propeller shaft, align match mark (1). Use following

specification to torque universal joint flange.
Tightening torque

Universal joint flange bolt (c): 55 Nm (5.5 kg-m, 40.0 ft. lbs.) 

6. Connect EGR pipe to left (No. 1) bank exhaust manifold (1). 
7. Install exhaust manifold covers (2). 
8. Install oil level gauge guide (3) using new O-ring.

9. Connect oxygen sensor lead wire couplers. Be sure to clamp its lead wires.

10. Connect negative (-) cable to battery. Upon completion of installation, start engine and check that no exhaust gas leakage exists.

Exhaust Pipe > < Exhaust Manifold|Specifications|Page 1354