Kizashi AWD L4-2.4L (2010)
Valve Clearance: Testing and Inspection
Valve Clearance Inspection and Adjustment
Inspection
1) Disconnect negative (-) cable at battery.
2) Remove cylinder head cover.
3) Insert socket wrench through service hole (2) of front fender lower lining (1). Turn crankshaft pulley (3) clockwise and align crankshaft pulley
notch mark (5) with timing chain cover at 0 degrees (TDC) mark (4). Matchmark camshaft housing No.1 (6) and exhaust camshaft timing sprocket
(7) have to be aligned.