suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Transmission Speed Sensor, A/T|Testing and Inspection|Page 3134 > < Transmission Speed Sensor, A/T|Testing and Inspection|Page 3132
Page 3
background image

a) Arrange 12 V battery (1) and connect its positive terminal to terminal "2" (2) and negative terminal to terminal "4" (4) of primary pulley speed

sensor connector or secondary pulley speed sensor connector.

b) Use ohmmeter to measure resistance between terminal "3" (3) of sensor connector and negative terminal of battery by passing flat-end

screwdriver or the like (5) between them while maintaining an approximately 1 mm (0.03 in) gap with respect to end face of primary pulley
speed sensor (6) or secondary pulley speed sensor (7).

Primary pulley speed sensor and secondary pulley speed sensor resistance
Less than 220 ohms (ON) <--> Infinity (OFF)

Transmission Speed Sensor, A/T|Testing and Inspection|Page 3134 > < Transmission Speed Sensor, A/T|Testing and Inspection|Page 3132