Sidekick L4-1324cc 1.3L SOHC 5 Carb 8V (1989)
Distributor Advance Unit: Testing and Inspection
Vacuum Advance
1.
Disconnect vacuum advance vacuum hose.
2.
Using a suitable vacuum pump apply 400mm Hg to advance unit, then release vacuum.
3.
Check generator base plate with the generator for smooth movement.
4.
If base plate movement is not smooth, inspect for damage and replace as necessary.