suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Pick-Up Coil, Ignition > < Ignition Coil|Locations
Page 1
background image

Ignition Coil: Testing and Inspection

1.

Disconnect battery ground cable.

2.

Disconnect wiring and high tension cable from coil.

3.

Remove ignition coil.

4.

Using an ohmmeter, measure primary coil resistance across positive and negative terminals. Cold resistance should be 1.35--1.65 ohms on
Sidekick. On Swift,
 resistance should be 1.12--1.38 ohms.

5.

Using an ohmmeter, measure secondary coil resistance between positive and high tension terminals. Cold resistance should be 11--14.5 ohms on
Sidekick. On Swift,
 resistance should be 11.4--15.5 ohms.

6.

Install ignition coil and connect all wiring and cables.

Pick-Up Coil, Ignition > < Ignition Coil|Locations