Sidekick 4 Door 4WD L4-1.8L DOHC MFI 16V (1996)
Fig. 10 No-Load Performance Test Lead Connections
1. Connect test leads as shown, Fig. 10.
2. Ensure pinion moves out and motor runs without stopping.
3. Measure ammeter current. Refer to Specifications.