Sidekick JSS 4D Hard Top 2WD L4-1.8L (1997)
11. Install air cleaner upper case and air cleaner outlet hose.
12. Install air temperature IAT sensor to air cleaner box.
13. Install strut tower bar. Tighten bolts and nuts to specified torque.
Tightening Torque (a): 90 Nm (9.0 kg-m, 65.5 ft. lbs.)
14. Check to ensure that all removed parts are back in place. Reinstall any necessary parts which have not been reinstalled.
15. Refill cooling system.
16. Connect negative cable at battery.
17. Finally, start engine and check for engine coolant leaks.