Sidekick JSS 4D Hard Top 2WD L4-1.8L (1997)
1. Install EVAP solenoid purge valve, EGR valve, IAC valve, EGR pipe and vacuum pipe to intake manifold use new gaskets, if equipped.
2. Install new intake manifold gasket to cylinder head.
3. Install intake manifold. Tighten bolts and nuts to specified torque
Tightening Torque (a): 23 Nm (2.3 kg-m, 17.0 ft. lbs.).
4. Connect water pipe to intake manifold.
5. Install intake manifold front stiffener and rear stiffener. Tighten bolts to specified torque.
Tightening Torque:
(a): 50 Nm (5.0 kg-m, 36.5 ft. lbs.).
(b): 25 Nm (2.5 kg-m, 18.0 ft. lbs.).