Sidekick JX 2D 4WD L4-1.6L (1998)
3. Install side plate to pump body.
NOTE: Carefully align the dowel pins on the side plate at an angle as shown in figure.
"a": 45°
4. Apply power steering fluid to sliding surface of rotor.
5. Install rotor to shaft.
6. Install new snap ring to shaft, then make sure to fit snap ring into shaft groove securely.
NOTE: Never reuse the removed snap ring.
7. Apply power steering fluid to sliding surface of cam ring.
8. install cam ring to pump body. The tapered end of cam ring should face the side plate.
9. Apply power steering fluid to each vane.
10. Install vanes (10 pieces) to rotor.