Swift L4-1298cc 1.3L SOHC MFI (1997)
1. Clean mating surfaces and install throttle body gasket to Early Fuel Evaporation (EFE) heater. Use new gasket.
2. Install throttle body to EFE heater and tighten bolts to specified torque.
Torque: 18 - 28 Nm (13.5 - 20.0 ft lb)
3. Install accelerator cable to throttle valve lever and cable bracket.
4. Connect fuel, cooling water, and vacuum hoses to throttle body. Clamp securely.
5. Connect throttle position sensor and injector coupler securely.
6. Refill cooling system.
7. Connect negative cable at battery.
8. With engine OFF and ignition switch ON, check for fuel leaks around fuel line connections.
9. Install air cleaner assembly.
10. Upon completion of installation, start engine and check for fuel and engine coolant leaks.
-
Adjust cable play to specifications.
Accelerator cable play at normal operating temperature
3 - 5 mm (0.12 - 0.20 in)