suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Number One Cylinder > < Firing Order|Specifications
Page 1
background image

Ignition Timing Connector: Description and Operation

The test switch terminal is included in the monitor coupler. When this terminal is grounded, ECM fixes the ignition timing to initial one. When both test
switch terminal and diagnosis switch terminal are grounded, ECM outputs A/F duty through the duty output terminal.

Number One Cylinder > < Firing Order|Specifications