Verona L6-2.5L (2005)
4. Install the front exhaust pipe and centermember.
5. In case of manual transaxle vehicle, install the shift control bracket and clip.
6. Install the steering interim shaft and bolt.
Tighten: Tighten the steering interim shaft bolt to 25 Nm (18 ft. lbs.).
7. Install the power steering pipe union nuts.
Tighten: Tighten the power steering pipe union nuts to 30 Nm (22 ft. lbs.).
8. Fill the power steering oil into the power steering system.
Impact Beam Removal and Installation